Discuss the significance and challenges associated with the much-awaited infrastructure project Zoji La tunnel. (200 words)
Refer – The Indian Express
Enrich the answer from other sources, if the question demands.
IAS Parliament 6 years
KEY POINTS
· The 14.15 km-long, two-lane bi-directional single tube Zoji-la tunnel is being constructed along with a 14.20 km long Parallel Escape (egress tunnel).
· It will be India’s longest road tunnel and Asia’s longest bi-directional tunnel.
Significance
· The tunnel will reduce the travel time from Baltal to Drass drastically.
· It will provide all-weather connectivity between Srinagar, Kargil and Leh, which otherwise remain cut-off from rest of country for several months in the winter due to heavy snow.
· The project will not only enhance the safety of travellers crossing the Zojila Pass but will also make the travel on Srinagar-Kargil-Leh Section of NH-1 free from avalanches.
· The project would trigger a boost in employment and business opportunities.
· Earlier, Medicines, vegetables and other important items are flown through the air during winters, which makes them expensive.
· This project will definitely improve peoples’ lives and make them more comfortable especially during the winters.
Strategic importance
· While Ladakh is connected to Pakistan through the Line of Control (LoC), Line of Actual Control (LAC) connects the region to China.
· Road connectivity is important for defence forces, keeping in view the activities carried out by China and Pakistan along the borders in Ladakh, Gilgit and Baltistan regions.
· This tunnel will help the Leh-based 14 Corps, which is responsible for military developments in areas near the Pakistan and China borders.
· In hostile times, this tunnel would be very helpful because it would ensure continuous logistics and other necessary supplies.
Challenges
· Tunnelling through the fragile Zojila formations would throw up geological surprises.
· The challenges includes
a) the lack of oxygen
b) snow accumulation up to 25-30 feet
c) peak minimum temperature of -45°C
· The entire project site is prone to avalanches.